Joiners-Workshop-Lymington
Installation of Powrmatic gas fired suspended heater
Joiners Workshop, Lymington, New Forest, Hampshire
Background:
A Joinery company based in Lymington, New Forest, Hampshire required. The 1,050m² building is approximately 9m tall. The Workshop required a heating solution which included forest protection facility.
Solution:
Industrial Heaters installed a Powrmatic LX120F 120.0kW gas fired suspended heater at high level.
Result:
The new Powrmatic heater and existing destratification fan system are suspended in the roof space and allow the Workshop to maintain a comfortable temperature for staff and materials.

Previous Case Study:
Next Case Study: