Material Supplier, Ferndown, Dorset
Powrmatic EUX30 suspended electric unit heaters
Material Supplier, Ferndown, Dorset
Background:
Based in Ferndown, Dorset, the building didn’t have a natural gas mains supply. With nowhere suitable to position an LPG bulk storage tank, or an oil tank, the building contractor proposed installing electric variants of warm air heaters.
Solution:
Industrial Heaters installed four Powrmatic EUX30 30.0kW suspended electric unit heaters.
Result:
The 485m² work/storage space is kept at a comfortable temperature for staff and products. For phase 2, our customer is installing solar panels on the roof of the building as a means of running the electric heaters, massively reducing the running cost.
Previous Case Study:
Next Case Study: