Case Study 10
Installation Of LPG Warm Air Heating
Manufacturing Workshop, Romsey
Workshop Size – 2,160m²
Background:
Founded in 1949, our client is a leading UK manufacturer of specialist pipe systems for industrial and building-related applications.
Industrial Heaters have been carrying out installation, maintenance and breakdown cover for them since 1998. Due to continued growth our client has recently expanded their manufacturing capacity and have contacted Industrial Heaters. One of our surveyors attended site and returned a free, no obligation quotation to supply and install a suitable heating system complete with destratification fans. The works also included modifications to the existing LPG gas main.
Solution:
Industrial Heaters specified and installed four Reznor fully modulating gas fired suspended heaters and six Reznor DS4 destratification fans. Each heater is controlled by a Smartcom3 energy saving controller, whilst the destratification fans were supplied integral thermostats. Concentric flue systems were installed complete with fresh air intakes, meaning the appliances are room sealed. The new gas main was installed in stainless steel, with all joints being press fit.
Result:
The four heaters and six destratification fans have given an evenly distributed heat system to the new manufacturing facility. The destratification fans are designed to reduce the temperature differential between the roof space and the floor level. This results in reduced fuel consumption. The Smartcom keypad operated controllers enable the heaters to have optimised start, frost protection and PIN facility to prevent unauthorised use.